Free Cheat-test Samples and Demo Questions Download
Adobe exams Adobe
Apple exams Apple
Avaya exams Avaya
Check Point exams Check Point
Cisco exams Cisco
Citrix exams Citrix
CIW exams CIW
CompTIA exams CompTIA
CWNP exams CWNP
EC-Council exams EC-Council
EMC exams EMC
Exin exams Exin
Fortinet exams Fortinet
GIAC exams GIAC
Hitachi exams Hitachi
HP exams HP
IBM exams IBM
Isaca exams Isaca
ISC exams ISC
ISEB exams ISEB
Juniper exams Juniper
LPI exams LPI
McAfee exams McAfee
Microsoft exams Microsoft
Oracle exams Oracle
PMI exams PMI
Riverbed exams Riverbed
SNIA exams SAP
Sun exams SAS
Symantec exams Symantec
VMware exams VMware
All certification exams

Avaya 6102.1 Exam - Cheat-Test.com

Free 6102.1 Sample Questions:

Q: 1
A customer is mirroring multiple ports to a single monitor port. What happens if the mirrored traffic exceeds the bandwidth of the monitor port?
A. The traffic will be buffered until there is available bandwidth.
B. The excess traffic will be dropped randomly.
C. The excess traffic will be dropped based upon the mirror priority of the ingress port.
D. The excess traffic will be dropped based upon the port priority of the ingress port.
Answer: B

Q: 2
Which types of packets will port mirroring not capture?
A. Packets that are dropped on the ingress MAC
B. Packets that are destined for the standby CP
C. Packets that are properly forwarded through the VSP
D. Packets that have a destination address of 255.255.255.255
Answer: A

Q: 3
A Split Multi Link Trunking (SMIT) for switch clustering is being configured. Which statement is a configuration requirement for the SMIT?
A. The CP-Limit is configured on edge switch stacks.
B. VLANs that are defined on the SMLT are also defined on the tote IST.
C. Neighboring edge switch stacks should be connected to each other via the DMLT connection to add resilient paths in the event of an SMLT failure.
D. Alternate the primary path of the SMLT connection Lo load balance the switch core.
Answer: B

Q: 4
A Virtual Services Platform (VSP) 9000 chassis has the following connections: Four 10GBaseER core connections in ports 3/4 , 3/8, 4/4, 4/8 (9024XL cards) 40 Copper 100BaseT connections for server aggregation (9048GT card)
How many Switch Fabric (SF) modules need to be installed in the roar of the chassis to ensure that all of the IO cards operate at full performance, even if a single SF modules fails (n + 1 SF redundancy)?
A. Install three SFs in St modules 1, 2, 4.
B. Install four SFs in SF modules 1, 2, 3, 4.
C. Install five SFs in SF modules 1, 2, 3, 4, 5.
D. Install six SFs in SF modules 1, 2, 3, 4, 5, 6.
Answer: D

Q: 5
Which two management ports are available on the CP module? (Choose two.)
A. Serial interface
B. USB (host) interface
C. Ethernet interface
D. Modem interface
Answer: A,D


© 2014 Cheat-Test.com, All Rights Reserved