Free Cheat-test Samples and Demo Questions Download
Adobe exams Adobe
Apple exams Apple
Avaya exams Avaya
Check Point exams Check Point
Cisco exams Cisco
Citrix exams Citrix
CIW exams CIW
CompTIA exams CompTIA
CWNP exams CWNP
EC-Council exams EC-Council
EMC exams EMC
Exin exams Exin
Fortinet exams Fortinet
GIAC exams GIAC
Hitachi exams Hitachi
HP exams HP
IBM exams IBM
Isaca exams Isaca
ISC exams ISC
ISEB exams ISEB
Juniper exams Juniper
LPI exams LPI
McAfee exams McAfee
Microsoft exams Microsoft
Oracle exams Oracle
PMI exams PMI
Riverbed exams Riverbed
SNIA exams SAP
Sun exams SAS
Symantec exams Symantec
VMware exams VMware
All certification exams

Avaya 6101.1 Exam - Cheat-Test.com

Free 6101.1 Sample Questions:

Q: 1
During a power-on or cold-start sequence, at which stage can the flags to change the operational environment of the switch be set?
A. boot monitor prompt
B. image search
C. system test
D. boot configuration prompt
Answer: A

Q: 2
Ethernet Routing Switch (ERS) 5500 supports a resilient stacking architecture using FAST Stack technology with this stacking capability, what is the total stacking bandwidth for a full stack of eight switches?
A. 400 Gbps
B. 640 Gbps
C. 720 Gbps
D. 1.15 Tbps
Answer: B

Q: 3
With release 4.0 or higher software on the Ethernet Routing Switch (ERS) 8300, an Advanced Routing License is required to enable certain features. Which two statements are true about the Advanced Routing License process and supported features for the ERS 8300? (Choose two)
A. The Advanced Routing License supports QoS, SMLT, VRRP, and OSPF
B. The Advanced Routing License supports SMLT, VRRP,OSPF, PIM-SM, and SLPP
C. To protect against security breaches, the ERS 8300 allows only a primary path for the license file
D. To protect against system flash failures, the ERS 8300 allows a primary, secondary, and tertiary for the license file.
Answer: B,D

Q: 4
Consider the following port conditions on an Ethernet Routing Switch (ERS) 8648GTRS 10/100/1000 Ethernet I/O module:
Left LEO-green
Right LEO-flashing green
What is the status of the port?
A. The link speed is 100 Mbps, and the port is disabled
B. The link speed is 1000 Mbps, and the port is disabled
C. The link speed is 100 Mbps, and the port is traffic
D. The link speed is 1000 Mbps, and the port is traffic
Answer: D

Q: 5
Which CLI command is used to validate that synchronization for High Availability mode is correct?
A. show ha
B. show ha-all
C. show ha-state
D. show ha-sync
Answer: C

Q: 6
After issuing a show mlt its stats (CLI) or show is stat (ACLI) command, it is determined that the running type is normal MLT and not IST. What are two causes of the IST not running properly? (Choose two)
A. The IST is not enabled on both swithes
B. The MLT ID does not match on both switches
C. The peer IP address is not the address of the peer switch IST VLAN
D. The peer IP address have to be 193.168.1.1/30 and 193.168.1.2/30
Answer: A,C

Q: 7
A customer has purchased some Ethernet Routing Switch (ERS) 5600 switches and must integrate two ERS 5600 units into an existing stack composed only of ERS 5500 switches What is the procedure for the integation of the new ERS 5600?
A. With power applied to the stack, change the existing ERS 5500 base unit to “None Base Unit” in mixed stack operation.Integate the two new ERS 5600 to the stack with them set as “Base Unit” in mixed stack operation. Reboot the stack
B. Remove the AC from the stack. Integate the two new ERS 5600 unit into the existing 5500 stack with one ERS 5600 set to “Base Unit” and one ERS 5600 set to “None Base Unit”.
Apply power to the stack
C. With power applied to the stack, Integate the two new ERS 5600 unit into stack as a non base unit in mixed stack operational mode. Change the existing ERS 5600 set to “Base Unit” and one ERS 5600 set to “None Base Unit”. Reboot the stack. Integrate the second ERS 5600 in mixed stack operational mode
D. With power applied to the stack, Integate the two new ERS 5600 units as non base units in mixed stack operational mode. After the two ERS 5600 units have obtained their configuration from the ERS 5500 base unit, change ERS 5500 to :Non Base Unit” and set one ERS 5600 to “Base Unit”. Reboot the stack.
Answer: B


© 2014 Cheat-Test.com, All Rights Reserved